Michelle, Kent. 
The Project Requirements 
 
Replacing an old unreliable Alpha 240. After many years of reliable service, the customer decided after recently experiencing a spell of issues relating to the operation, to have the boiler replaced for a brand-new Worcester Bosch combination boiler. 
What We Are Doing 
 
Removed the old boiler in preparation for new. The new boiler was in the same location, although the gas supply needed to be upgraded. We removed the floors and run a new gas supply from the boiler to the gas meter. Once completed, we refitted and secured the floorboards with screws and refitted the carpet. Included with this installation was to power flush the system using Fernox cleaning chemicals, and once completed protect the system with Fernox Protector. We changed the controls for a wireless intelligent thermostat, which can be controlled by a mobile phone. Installation and commission completed, re-laid to the customer on how to operate. 
Tagged as: Combi Boiler
Share this post:

Leave a comment: 

Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings